Empty room with timber floor before handover

Independent. Practical. Precise.

testing that proves performance

Approved Document E

Pre-completion sound testing

on-site diagnostics

Finding why performance was missed

remedial advice

Practical routes back to compliance

Independent. Practical. Precise.

how testing works

Testing verifies whether the required performance has been achieved. If it has not, the important part is understanding why and setting out a practical route forward.

book & carry out testing

Testing or commissioning measurements undertaken to the relevant method and coordinated with the site programme.

report results

A clear report setting out the method, results and relevant compliance or performance conclusion.

remedial advice if needed

Where performance falls short, further investigation can help interpret the result, identify likely causes and advise on pragmatic remedial options under an agreed scope.

Independent. Practical. Precise.

Clear results. Practical answers when performance falls short.

Loudspeakers
what’s included
  • Approved Document E pre-completion sound insulation testing and reporting

  • On-site sound and vibration measurements for diagnostics and verification

  • Remedial advice where performance is not achieved

  • Office privacy troubleshooting, with clear recommendations

Empty office floor ready for fit-out
when you need it
  • Pre-completion testing for Building Regulations sign-off

  • Planning conditions that require verification

  • Performance problems after occupation

  • Complaints about speech privacy in offices

Glazed corridor in a completed building
what you get
  • Test results and compliance reporting

  • An evidence-based view of what is likely to be going wrong, with practical next steps shaped by the investigation scope and available access

  • Remedial recommendations

  • Re-testing to confirm the fix